Skip to content

Menu

Panel schedule template and circuit directory

Enter each breaker by space number with what it feeds, its rating, poles and load, and Busbar lays out the panel schedule, adds up the load on each phase and prints a circuit directory cut to the size of your panel door. It flags a breaker loaded past its rating with continuous loads at 125 % (NEC 210.20(A)) and a main breaker larger than the bus rating (408.36). One panel at a time is free with no sign-up, print and PDF included; Pro is US$9 a month to save every panel of a job, print their directories together and download the schedule as a report with your company and job address. It adds up connected load, not an Article 220 load calculation, and only knows the circuits you enter, so trace each one on site.

  • Printable directory
  • Phase totals
  • No sign-up
Panel schedule
A

The breaker that protects this panel

A

From the label inside the panel

Where the power comes from and where that is. 408.4(B) requires it on feeder-supplied panels, except in one- and two-family dwellings.

in

3–7.5 in: measure the card holder on the door

in

4–9 in

Printed at the bottom of the directory. 408.4(A) asks for abbreviations and symbols to be explained.

Circuits

Odd spaces on the left, even on the right, as in most panels. Describe each circuit by what it feeds and where, not by who uses the room, and mark unused breakers as spares. Continuous means the load runs 3 hours or more.

1Phase A
A
VA
2Phase A
A
VA
3Phase B
A
VA
4Phase B
A
VA
5Phase A

Range 3/5, 2-pole breaker

6Phase A
A
VA
7Phase B
A
VA
8Phase B
A
VA
9Phase A

Water heater, basement 7/9, 2-pole breaker

10Phase A
A
VA
11Phase B
A
12Phase B

EV charger, garage 10/12, 2-pole breaker

13Phase A
14Phase A
15Phase B
16Phase B
17Phase A
18Phase A
19Phase B
20Phase B
21Phase A
22Phase A
23Phase B
24Phase B

Phase A carries the most: 144.3 A

That is below the 200 A rating of the main breaker and bus, and no breaker is loaded past its rating. This screens the loads you entered; it is not a load calculation.

NEC 2023 · 210.20(A) · 408.36 · 120/240 V single-phase

Panel

Panel
Main panel
Supply system
120/240 V single-phase
Main or upstream breaker
200 A
Bus rating
200 A
Spaces
24

Circuits

1 · A · Kitchen counter receptacles, left of sink · 20 A 1P
1,500 VA · 12.5 A
2 · A · Kitchen island receptacles · 20 A 1P
1,500 VA · 12.5 A
3/5 · B/A · Range · 40 A 2P
8,000 VA · 33.3 A
4 · B · Dishwasher · 20 A 1P
1,200 VA · 10.0 A
6 · A · Laundry receptacle · 20 A 1P
1,500 VA · 12.5 A
7/9 · B/A · Water heater, basement · 30 A 2P, continuous
4,500 VA · 18.8 A
8 · B · Bedrooms 2 and 3, lights and receptacles · 15 A 1P
1,000 VA · 8.3 A
10/12 · A/B · EV charger, garage · 50 A 2P, continuous
9,600 VA · 40.0 A
11 · B · Spare · 20 A 1P
—

Connected load by phase

Phase A: 15,550 VA
129.6 A
Phase A with continuous loads × 125 %
144.3 A
Phase B: 13,250 VA
110.4 A
Phase B with continuous loads × 125 %
125.1 A
Largest deviation from the phase average (VA)
8.0 %

Checks

Every breaker is at least its load, continuous loads × 125 %
Yes
Main or upstream breaker (200 A) not above the bus rating (200 A)
Yes
Heaviest phase, connected load (144.3 A) vs. the 200 A rating
Below
  • Spaces are numbered odd on the left and even on the right. Each row of two spaces is on one phase, A, B (and C) repeating down the panel, and a 2- or 3-pole breaker takes the spaces below it on the same side. Check the wiring diagram on the panel label.
  • Current is VA ÷ line-to-neutral voltage for 1 pole, VA ÷ line-to-line voltage for 2 poles and VA ÷ (1.732 × line-to-line voltage) for a balanced 3-pole load. VA is split equally between a breaker’s poles and phase currents are added arithmetically, which overstates line-to-line loads on a three-phase panel.
  • Continuous loads (3 hours or more) count at 125 % against their breaker, per 210.20(A). The exception for assemblies listed for 100 % operation is not applied.
  • 408.30 (408.14 in NEC 2026) requires the panelboard rating to be at least the load calculated under Article 220 (Article 120 in NEC 2026), which applies demand factors. Connected load is usually higher, so a phase above the rating here is a reason to run that calculation.
  • Not checked: the 408.36 exceptions, motors, demand factors, multiwire branch circuits, tandem breakers, conductor sizes and available fault current.
  • This is not the professional advice of a licensed electrician. Check the result against the electrical code your jurisdiction enforces before you install anything.

Sizing the service or feeder needs demand factors, not connected load: use the dwelling load calculator for a one-family house.

Permit-ready PDF report

The same calculation with every NEC reference, your company and the job address, on US Letter. Saved in this browser only.

Pro, US$9/month

Door directory

Free for every panel. Prints on US Letter at 7 × 9 in: choose 100 % or Actual size, not Fit to page, and cut on the outer line. Card stock in a sleeve or a full-sheet label lasts longer than plain paper; 408.4(A) asks for a legible and permanent directory on, inside or next to the panel door.

Main panel120/240 V single-phase · Main 200 A · Bus 200 A1Kitchen counter receptacles, left of sink · 20 A2Kitchen island receptacles · 20 A3Range · 40 A · 2P 3/54Dishwasher · 20 A5Range · 2P 3/56Laundry receptacle · 20 A7Water heater, basement · 30 A · 2P 7/98Bedrooms 2 and 3, lights and receptacles · 15 A9Water heater, basement · 2P 7/910EV charger, garage · 50 A · 2P 10/1211SPARE · 20 A12EV charger, garage · 2P 10/1213SPACE14SPACE15SPACE16SPACE17SPACE18SPACE19SPACE20SPACE21SPACE22SPACE23SPACE24SPACEKey: SPARE = breaker installed, not in use. SPACE = no breaker. 2P / 3P = 2- or 3-pole breaker.Cut on the outer line: 7 × 9 in. Print at 100 % (Actual size), not Fit to page. Keep this directory up to date when circuits change.Planning aid made with Busbar, not the professional advice of a licensed electrician. Verify every circuit on site; the authority having jurisdiction decides what thedirectory must say.

Saved panels Pro

Keep every panel of a job in this browser and print all their directories in one PDF. Nothing is uploaded: back up to a file before you clear the browser or switch devices.

How it works

  1. 01

    Set up the panel

    Name, supply system and number of spaces, the main breaker and the bus rating from the panel label, and the size of the card holder on the door.

  2. 02

    Walk the breakers

    For each space pick Load, Spare breaker or Space, then enter what it feeds and where, the breaker rating, poles and load in VA. A 2- or 3-pole breaker takes the spaces below it.

  3. 03

    Print and post it

    Check the phase totals, print the directory at 100 %, cut it out and put it in the door.

Questions

What does NEC 408.4 require on a panel directory?

Every circuit and circuit modification needs a legible and permanent description of its purpose, in a circuit directory on the face of, inside of, or in an approved location next to the panel door. Spare breakers are described too, descriptions cannot depend on transient conditions of occupancy (write “north bedroom”, not a person’s name), and abbreviations and symbols must be explained (NEC 2023 408.4(A)). Panels supplied by a feeder in other than one- and two-family dwellings are also marked with where the power comes from and its location, on a durable label that is not handwritten (408.4(B)).

What is the difference between a spare and a space?

A spare is a breaker that is installed but not in use; 408.4(A) requires spare positions with an unused breaker to be described, so the directory marks it SPARE. A space is a position with no breaker. The key at the bottom of the directory explains both.

Why is a phase total higher than my main breaker?

Busbar adds up the connected load you enter. Services and feeders are sized from a load calculation with demand factors (Article 220, moved to Article 120 in NEC 2026), which usually comes out lower, so a connected total above the main breaker is a reason to run that calculation, not a finding on its own. For a one-family house, use the dwelling load calculator.

How do I print the directory at the right size?

Measure the card holder or the space inside the door and enter its width (3 to 7.5 in) and height (4 to 9 in). Print on US Letter at 100 % or Actual size, not Fit to page, and cut on the outer line. The PDF prints the same way.

Which NEC edition does it follow?

NEC 2023: 408.4 for the directory, 210.20(A) for breakers and 408.36 for the main breaker. NEC 2026 keeps 408.4(A), 210.20(A) and 408.36 and moves the rule that a panelboard be rated for the calculated load from 408.30 to 408.14. Check what your jurisdiction has adopted.

Where is my panel saved?

In this browser only. The panel you are editing is kept as you type; Pro saves several panels and backs them up to a file. Nothing is uploaded to Busbar.

Do I need to sign up?

No. Every calculator works without an account. You only need one, with a verified email address, to subscribe to Pro.

Hand the inspector a clean calculation

Every calculator is free, with the full step-by-step result and NEC references on the page. Pro is US$9 a month for PDF reports with your company and the job address.